Aljassmi, H, Han, S and Davis, S (2014) Project Pathogens Network: New Approach to Analyzing Construction-Defects-Generation Mechanisms. Journal of Construction Engineering and Management, 140(01).

Casanovas, M d M, Armengou, J and Ramos, G (2014) Occupational Risk Index for Assessment of Risk in Construction Work by Activity. Journal of Construction Engineering and Management, 140(01).

Chang, C (2014) Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique. Journal of Construction Engineering and Management, 140(01).

Choi, S, Kim, D Y, Han, S H and Kwak, Y H (2014) Conceptual Cost-Prediction Model for Public Road Planning via Rough Set Theory and Case-Based Reasoning. Journal of Construction Engineering and Management, 140(01).

González, P, González, V, Molenaar, K and Orozco, F (2014) Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 140(01).

Laryea, S and Lubbock, A (2014) Tender Pricing Environment of Subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(01).

Ling, F Y Y, Ke, Y, Kumaraswamy, M M and Wang, S (2014) Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 140(01).

Narbaev, T and De Marco, A (2014) Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion. Journal of Construction Engineering and Management, 140(01).

Ning, Y and Ling, F Y Y (2014) Boosting Public Construction Project Outcomes through Relational Transactions. Journal of Construction Engineering and Management, 140(01).

Panas, A and Pantouvakis, J P (2014) Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations. Journal of Construction Engineering and Management, 140(01).

  • Type: Journal Article
  • Keywords: Caissons; Productivity; Simulation; Statistics; Construction management; Caissons; Productivity; Simulation; Statistics; Quantitative methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000782
  • Abstract:
    The learning curve theory is implemented for the assessment and prediction of performance in repetitive and complex construction operations. The purpose of this study is to explore the applicability of learning curve concepts for the fabrication of floating caissons, a construction activity that has not been adequately explored in the published literature. Although standard statistics and simulation methods have been used, a direct comparison of the produced results, along with their emerging inferences, is attempted for the first time. In addition, simulation modeling is used to predict future performance within the learning curve paradigm. An extended version of an existing simulation platform (CaissonSim) is used to execute the computations. A straight-line model is applied to quantify the improvements in productivity and the dynamically changing learning rates. A comparative analysis of the results has shown that both the statistical and simulation-based approaches have yielded satisfactory results, although the level of accuracy and variability is differentiated. Thus, it is suggested that the synergetic implementation of both methods of analysis is more beneficial because, when combined, they provide a robust analytical framework.

Rosenfeld, Y (2014) Root-Cause Analysis of Construction-Cost Overruns. Journal of Construction Engineering and Management, 140(01).

Sun, C, Mackley, A and Edara, P (2014) Programmatic Examination of Missouri Incentive/Disincentive Contracts for Mitigating Work Zone Traffic Impacts. Journal of Construction Engineering and Management, 140(01).

Syal, M, Duah, D, Samuel, S, Mazor, M, Mo, Y and Cyr, T (2014) Information Framework for Intelligent Decision Support System for Home Energy Retrofits. Journal of Construction Engineering and Management, 140(01).

Yang, I, Lin, Y and Lee, H (2014) Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. Journal of Construction Engineering and Management, 140(01).

Zhang, S, Du, C, Sa, W, Wang, C and Wang, G (2014) Bayesian-Based Hybrid Simulation Approach to Project Completion Forecasting for Underground Construction. Journal of Construction Engineering and Management, 140(01).